This text has been translated by auto-translation. There may be a slight difference between the original text and the translation. (Original Language: 日本語)

Notification

No Image

Boso Flower Line to be reopened to traffic

The Boso Flower Line from Hirasunaura Beach Hotel to RECAMP Tateyama ( and the former Tateyama Family Park ), which had been closed since Saturday, January 6 ( ) due to strong winds ( and flying sand ), will be closed on January 8 ( Monday ) at 14:30 The road closure was lifted at 30 minutes.

Awa Civil Engineering Office, Administration Division
Tel: 0470-22-4342

--
  • Posted : 2024/01/07
  • Published : 2024/01/07
  • Changed : 2024/01/07
  • Total View : 104 persons
Web Access No.1576109