Info Type
View Option
Sort by Category
Notification
Construction update: Route 40 Transit-Plus Multimodal Corridor Project – January 17
- [Registrant]City of Seattle
- [Language]日本語
- [Location]Seattle, WA
- Posted : 2025/01/17
- Published : 2025/01/17
- Changed : 2025/01/17
- Total View : 112 persons
- Find local business with Town Guide
-
- Peace of mind for your future plans ・ We...

-
When buying a home, first contact your loan company. Most people will first contact a real estate agent when buying a house. Then, you will probably be asked, "Do you have a Pre-approval Letter? In th...
+1 (206) 679-3371Groves Capital, Inc. (Mitsuko Miller)
-
- The Japan Clinic offers comprehensive me...

-
Japan Clinic provides medical services in Japanese to Japanese people, especially those who are not proficient in English. Our nurse practitioners from Japan can carefully provide medical services in ...
+1 (702) 994-7267Nippon Clinic
-
- A secluded resort nestled in the wildern...

-
A new glamping style based on the theme of food"Cuisine ・ Resort " Enjoy a special moment with your dog in one of Kanto's best natural locations for lodging, day trips, and saunas. A superb resort s...
+81-470-29-5975THE CHIKURA UMI BASECAMP
-
- A science museum dedicated to "space and...

-
Children and adults alike can experience the wonders of science through hands-on exhibits that allow them to learn while having fun by looking at and touching the exhibits. Science shows by professio...
+81-6-6444-5656大阪市立科学館
-
- Dr. Hybrid Repair U.S.A. We are a Japane...

-
We offer low-cost hybrid battery repair, inspection and maintenance services. We also provide on-site maintenance service and road service in case of failure or non-READY. We offer a full range of h...
+1 (310) 961-6655TAKAHITO MOTORS
-
- サンフランシスコ長崎県人会
-
- ! ] Are you in trouble with traffic acci...

-
Are you worried about the cost of medical treatment and repairs or negotiating with insurance companies after a sudden traffic accident ? We, as a law firm specializing in traffic accidents, will do ...
+1 (415) 651-7521Sang Injury Law Firm
-
- We are Soma Clinic, a general medical cl...

-
Residents, tourists, and international students, both children and adults, can be seen ♪ Referrals to specialists are also available. We also accept cashless insurance in most cases. We are open eve...
+1 (808) 358-2182Dr. Soma Clinic Waikiki
-
- Sola st. is a select store featuring fas...

-
The light blue door is the landmark of this select store. ♪ In addition to the handmade goods sold in the store, there will also be a variety of stores selling sweets, alcohol, and other food and beve...
+81-4-7092-4778Sola street
-
- Calligraphy is something that anyone can...

-
The calligraphy is the person." We place more importance on writing characters that make the most of one's personality than on the shape of the character. We will teach you how to use a brush, but y...
+1 (650) 245-7767Japanese Calligraphy Class - Yukiko Tanaka
-
- JAPAN Fes
-
- ★ Piano Classes in Torrance ★ Teacher wh...

-
Piano lessons to bring out your child's talent ♪ Don't you think it's boring to just read music and play the piano ? We look forward to hearing from you first. 2 minutes from Rolling Hills Plaza ! ...
+1 (310) 702-4355Kayo Piano Lesson
-
- We are an accounting firm in the United ...

-
Tax support between Japan and the U.S. ! Speedy procedures and aftercare ! Japanese ・ English either way.
+1 (877) 827-1040Todd's Accounting Services /Mayumi Ozaki (尾崎会計事務所)
-
- We teach you how to buy a car ! San Fran...

-
We are a ・ California DMV authorized car dealer in Los Angeles for all makes and models of new and used cars. * New Car Sales * Used Car Sales * Purchase * Leasing
+1 (310) 527-2071San Francisco Fleet & Leasing
-
- Cheap ! Fun ! Open every day of the year...

-
Fun ! Happy ! First in America ! DAM & Denmoku ID finally arrives ! Full system and number of songs ! New songs added monthly ! Enjoy Karaoke in America as in Japan For more information on prices, ...
+1 (408) 865-0955Gamba Karaoke

City of Seattle Logo
Route 40 TPMC logo
________________________________________________________________________
Route 40 Westlake trenching
Two crewmembers perform trenching work off Westlake Ave near Halladay St
________________________________________________________________________
What's happening now?
Dear Community Members,
We want to thank you for attending our virtual online open house last week to discuss construction starting in the Fremont and Westlake Ave neighborhoods for the Route 40 Transit-Plus Multimodal Corridor Project [ https://us-west-2.protection.sophos.com?d=govdelivery.com&h=65ba9cc2f3dc4f0f8fc82a85a6bf3865&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVa6VABJJSW-Nx63Jpz4i9T9RDnSkFAdZa9EH8toe6YlnzG0LMThLcQjTo2lAm1nVXZGBj1Hkqpxp2XYyl3_kwN8Q7Y4ijiyXlODDAxLcCy0Ns-ses8r9YcIYl6LrUO1tt8&t=UGZmT3lkYlFhWU02ckFOaVlqYlhrd0tKWjl4UVZxT1hkUnh6ZHp4ZStXbz0%3D&u=aHR0cHM6Ly9saW5rcy0xLmdvdmRlbGl2ZXJ5LmNvbS9DTDAvaHR0cHM6JTJGJTJGd3d3LnNlYXR0bGUuZ292JTJGdHJhbnNwb3J0YXRpb24lMkZwcm9qZWN0cy1hbmQtcHJvZ3JhbXMlMkZwcm9ncmFtcyUyRnRyYW5zaXQtcHJvZ3JhbSUyRnRyYW5zaXQtcGx1cy1tdWx0aW1vZGFsLWNvcnJpZG9yLXByb2dyYW0lMkZyb3V0ZS00MC0tLXRyYW5zaXQtcGx1cyUzRnV0bV9tZWRpdW09ZW1haWwlMjZ1dG1fc291cmNlPWdvdmRlbGl2ZXJ5LzEvMDEwMDAxOTQ3NTc4N2Q3ZS0zODE4ZWNlMy1jNjk4LTRlZTktYjM2MC1hMTY0M2NjMjdmNjEtMDAwMDAwL2JSUmp0cm1mNEpvY2dGQlgyTUk4NDdTU0JwMHEzQVE4MGpaVThERm0wTjg9Mzg4&utm_medium=email&utm_source=govdelivery ]. The team is still finalizing responses to the questions that we were not able to get to during the presentation. These answers will be available on the project website soon. Please stay tuned for updates.
To learn more about what to expect during construction, please visit the project webpage [ https://us-west-2.protection.sophos.com?d=seattle.gov&h=13fa6aeb8b12432eb8ffb4a7fc6f318c&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVYvMXkb5y1rh_jmhCD6q3lAKUrO49ywWjW_y-N0Uq9DQw&t=SGtJSXFONmxaQmVMdEFWditvempwUUY3UmZSK0tsU2UrMTVDWnBqOVBPVT0%3D&u=aHR0cHM6Ly9zZWF0dGxlLmdvdi90cmFuc3BvcnRhdGlvbi9yb3V0ZTQwP3V0bV9tZWRpdW09ZW1haWwmdXRtX3NvdXJjZT1nb3ZkZWxpdmVyeQ%3D%3D&utm_medium=email&utm_source=govdelivery ] which provides detailed information on construction activities [ https://us-west-2.protection.sophos.com?d=seattle.gov&h=13fa6aeb8b12432eb8ffb4a7fc6f318c&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVYvMXkb5y1rh_jmhCD6q3lAKUrO49ywWjW_y-N0Uq9DQw&t=aVIyKzVzZHJOUFNlWkxneEJCYnZ2RTZBUVJOYlJyeW1QMkZJL1JpSUFCRT0%3D&u=aHR0cHM6Ly93d3cuc2VhdHRsZS5nb3YvZG9jdW1lbnRzL0RlcGFydG1lbnRzL1NET1QvVHJhbnNpdFByb2dyYW0vUm91dGUlMjA0MCUyMFRQTUMvQ29uc3RydWN0aW9uX1Njb3BlX0RlZmluaXRpb25zX1JvdXRlJTIwNDAucGRmP3V0bV9tZWRpdW09ZW1haWwmdXRtX3NvdXJjZT1nb3ZkZWxpdmVyeQ%3D%3D&utm_medium=email&utm_source=govdelivery ] and construction locations in Fremont [ https://us-west-2.protection.sophos.com?d=seattle.gov&h=13fa6aeb8b12432eb8ffb4a7fc6f318c&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVYvMXkb5y1rh_jmhCD6q3lAKUrO49ywWjW_y-N0Uq9DQw&t=dlVyNG0wNGRlL0h0QjIyQncvKzYvbW1MQVJIaVBzZys5S2RHVjE5WWVHcz0%3D&u=aHR0cHM6Ly93d3cuc2VhdHRsZS5nb3YvZG9jdW1lbnRzL0RlcGFydG1lbnRzL1NET1QvVHJhbnNpdFByb2dyYW0vUm91dGUlMjA0MCUyMFRQTUMvUm91dGVfNDBfRnJlbW9udF9Db25zdHJ1Y3Rpb25fUGxhbnNfV2ViYXBnZS5wZGY_dXRtX21lZGl1bT1lbWFpbCZ1dG1fc291cmNlPWdvdmRlbGl2ZXJ5&utm_medium=email&utm_source=govdelivery ] and along Westlake Ave. [ https://us-west-2.protection.sophos.com?d=seattle.gov&h=13fa6aeb8b12432eb8ffb4a7fc6f318c&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVYvMXkb5y1rh_jmhCD6q3lAKUrO49ywWjW_y-N0Uq9DQw&t=TG5GK1ZJaWJCVEJLc1lyS0tiM2d0Sm8xYStzYUZHUloyWU43NDFSeTUrMD0%3D&u=aHR0cHM6Ly93d3cuc2VhdHRsZS5nb3YvZG9jdW1lbnRzL0RlcGFydG1lbnRzL1NET1QvVHJhbnNpdFByb2dyYW0vUm91dGUlMjA0MCUyMFRQTUMvUm91dGVfNDBfV2VzdGxha2VfQXZlX05fQ29uc3RydWN0aW9uX1BsYW5zX1dlYmFwZ2UucGRmP3V0bV9tZWRpdW09ZW1haWwmdXRtX3NvdXJjZT1nb3ZkZWxpdmVyeQ%3D%3D&utm_medium=email&utm_source=govdelivery ] You can also read our SDOT blog post [ https://us-west-2.protection.sophos.com?d=seattle.gov&h=13fa6aeb8b12432eb8ffb4a7fc6f318c&i=NjVlMjQ4NzM0ODMzNjA1ZjY4NzdkMzc3&p=m&s=AVNPUEhUT0NFTkNSWVBUSVYvMXkb5y1rh_jmhCD6q3lAKUrO49ywWjW_y-N0Uq9DQw&t=d1o2VFp1VmluSjYyeEJra3dpL3R1aEtSbWI2WktDWnFpbllTR0dqU3htYz0%3D&u=aHR0cHM6Ly9zZG90YmxvZy5zZWF0dGxlLmdvdi8yMDI1LzAxLzA3L3JvdXRlLTQwLXByb2plY3QtY29uc3RydWN0aW9uLWZyZW1vbnQtd2VzdGxha2UvP3V0bV9tZWRpdW09ZW1haWwmdXRtX3NvdXJjZT1nb3ZkZWxpdmVyeQ%3D%3D&utm_medium=email&utm_source=govdelivery ].
*What's happening in Westlake?*
Crews have begun trenching across the parking lot south of Halladay St to install conduit, alongside demo work and the installation of a new pedestrian curb ramp near the Westlake Cycle Track.
Construction work on Crockett St near Westlake Ave is expected to begin as early as next week, with work on 8th Ave and Galer St starting as early as February. We’ll provide further updates as these projects progress.
*What to Expect on Westlake Ave and Halladay St:*
*
*Parking Lot Access:*
* Access will remain available during work hours with occasional temporary closures.
* Crews will work on one half of the lot at a time, plating the other half to maintain access.
* After work hours, the entire lot will be safely plated and accessible.
*
*Construction Timeline:*
* Work in the parking lot is expected to finish by mid-February.
* Crews will return later this year for final electrical installation after inspections.
* Work on Westlake Ave and Halladay St will continue through February 2024, with staging in the parking lot.
*Community Impacts:*
* Noise, dust, and increased vehicle traffic.
* Temporary parking restrictions, driveway closures, and traffic adjustments.
* Night and weekend work to reduce daytime disruption.
* Potential short-term utility service impacts.
________________________________________________________________________________
Project Benefits
In addition to the 5-10% transit travel time savings, 14-17% in Ballard to Downtown, the Route 40 project will maintain and modernize vital infrastructure
Route 40 infographic
________________________________________________________________________
What you can expect during construction
* Temporary lane reductions
* Temporary driveway closures
* Temporary bus stop closures
* Temporary parking restrictions
* Temporary sidewalk detours
* Temporary storage of construction supplies in the street
* Temporary noise, dust and vibrations
* Bus stop relocations
* Drainage work: This involves digging trenches to help manage water flow
* Signal pole foundation excavation: This work involves digging for the pole foundations prior to when we order custom signal poles which takes a while to build and to make sure we know there are no underground obstructions
* Trenching for conduit: This involves digging trenches to lay down pipes or cables underground
* Sidewalk curb bulb out: This involves making the curbs stick outward for safety or accessibility
* Mill and fill overlay: This is when the top layer of the road gets removed and replaced with new asphalt
The construction timeline is always subject to change depending on weather conditions and materials availability. We are committed to keeping you informed and maintaining open communication throughout the remainder of this project.To learn more about the project and designs, visit our online open house. [ https://route40.infocommunity.org/?utm_medium=email&utm_source=govdelivery ]
________________________________________________________________________
Contact Us & Share Project Updates
Thank you for signing up for updates about the Route 40 Transit Plus Multimodal Corridor Project [ https://www.seattle.gov/transportation/projects-and-programs/programs/transit-program/transit-plus-multimodal-corridor-program/route-40---transit-plus?utm_medium=email&utm_source=govdelivery ]. We encourage you to share this message with your neighbors. They can also stay informed by signing up for email updates [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/new ].
You can learn more on our project webpage [ https://www.seattle.gov/transportation/projects-and-programs/programs/transit-program/transit-plus-multimodal-corridor-program/route-40---transit-plus?utm_medium=email&utm_source=govdelivery ] or contact us by:
* Email: Route40@seattle.gov
* Phone: (206) 775-8731 [ tel:%20+1%20(206)%20775-8731 ] [ tel:%20+1%20(206)%20512-3950 ] (leave a voicemail and we will return your call)
________________________________________________________________________
Other Projects Along This Route
Our project team is in close coordination with the following projects. Please visit their project webpage to see the latest update:
* 15th Ave NW and Ballard Bridge Paving and Safety Project [ https://www.seattle.gov/transportation/projects-and-programs/programs/maintenance-and-paving/current-paving-projects/15th-ave-w/nw-and-ballard-bridge-paving-project?utm_medium=email&utm_source=govdelivery ]
* Ship Canal Water Quality Project [ https://www.seattle.gov/utilities/neighborhood-projects/ship-canal?utm_medium=email&utm_source=govdelivery ]
* RapidRide J Line - Formerly RapidRide Roosevelt [ https://www.seattle.gov/transportation/projects-and-programs/programs/transit-program/transit-plus-multimodal-corridor-program/rapidride-roosevelt?utm_medium=email&utm_source=govdelivery ]
* N 102nd St/Aurora Ave N Pedestrian Bridge [ https://seattle.gov/transportation/projects-and-programs/programs/bridges-stairs-and-other-structures/bridges/n-102nd-st/aurora-ave-n-ped-bsr?utm_medium=email&utm_source=govdelivery ]
* 13th Ave NW/Holman Rd NW Pedestrian Bridge Seismic Retrofit [ https://seattle.gov/transportation/projects-and-programs/programs/bridges-stairs-and-other-structures/bridges/13th-ave-nw/holman-nw-bsr?utm_medium=email&utm_source=govdelivery ]
* "Missing Link" Bike Route Study on NW Market St - Leary Ave NW - 17th Ave NW [ https://www.seattle.gov/transportation/projects-and-programs/programs/bike-program/ballard-bike-route-study?utm_medium=email&utm_source=govdelivery ]
* Sound Transit Northgate Station [ https://www.soundtransit.org/system-expansion/northgate-station?utm_medium=email&utm_source=govdelivery ]
________________________________________________________________________
Translations
If you need this information translated, please call *206-775-8731 [ tel:206-775-8731 ]*.
如果您需要此信息翻譯成中文 請致電 *206-775-8731 [ tel:206-775-8731 ]*.
Kung kailangan mo ang impormasyon na ito na nakasalin sa Tagalog mangyari lamang na tumawag sa *206-775-8731 [ tel:206-775-8731 ]*.
Si necesita traducir esta información al español, llame al *206-775-8731 [ tel:206-775-8731 ]*.
Odeeffannoon kun akka siif *206-775-8731 [ tel:206-775-8731 ]*.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gọi *206-775-8731 [ tel:206-775-8731 ]*.
የዚህን መረጃ ትርጉም ከፈለጉ፣ በዚህ ስልክ ቁጥር ይደውሉ፡ *206-775-8731 [ tel:206-775-8731 ]*.
ናይዚ ሓበሬታ ትርጉም እንተደሊኹም፣ በዚ ቁጽሪ ስልኪ ይድውሉ፡ *206-775-8731 [ tel:206-775-8731 ]*.
당신이 번역이 정보를 필요로하는 경우에, *206-775-8731 [ tel:206-775-8731 ]* 로 전화 해주십시오.
اذا تريد ترجمة هذه المعلومات, يرجى الاتصال برقم
*206-775-8731 [ tel:206-775-8731 ]*
*Seattle City Hall*
600 4th Avenue
Seattle, WA 98104
*Phone: 206-684-2489 (CITY)*
facebook [ https://www.facebook.com/cityofseattlegov/?utm_medium=email&utm_source=govdelivery ]twitter [ https://twitter.com/cityofseattle?utm_medium=email&utm_source=govdelivery ]instagram [ https://www.instagram.com/cityofseattlegov/?utm_medium=email&utm_source=govdelivery ] [ https://twitter.com/cityofseattle?utm_medium=email&utm_source=govdelivery ] seattle dot gov
Manage Preferences [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/edit?preferences=true#tab1 ] | Unsubscribe [ https://public.govdelivery.com/accounts/WASEATTLE/subscriber/one_click_unsubscribe?verification=5.7e4abd93610d77ba0dce3e5196581a5c&destination=mshinji3056%40gmail.com ] | Contact Us [ http://www.seattle.gov/customerservice/contact.htm?utm_medium=email&utm_source=govdelivery ] | Help [ https://subscriberhelp.govdelivery.com/ ] | Privacy [ https://www.seattle.gov/privacy-statement?utm_medium=email&utm_source=govdelivery ]
________________________________________________________________________
This email was sent to mshinji3056@gmail.com using GovDelivery Communications Cloud on behalf of: City of Seattle, Washington · 707 17th St, Suite 4000 · Denver, CO 80202 GovDelivery logo [ https://subscriberhelp.granicus.com/?utm_medium=email&utm_source=govdelivery ]
body .abe-column-block { min-height: 5px; } table.gd_combo_table img {margin-left:10px; margin-right:10px;} table.gd_combo_table div.govd_image_display img, table.gd_combo_table td.gd_combo_image_cell img {margin-left:0px; margin-right:0px;} table.govd_hr {min-width: 100%;}